![ABB SCU200 User Manual Download Page 33](http://html1.mh-extra.com/html/abb/scu200/scu200_user-manual_3320180033.webp)
33
SCU200
INSITE ENERGY MANAGEMENT SYSTEM
4.4.Assembly of connectors, current sensors, I/O modules and smart accessories.
• Assembly of connectors
Use the connectors only once.
Use the connectors only once.
Connect up to 32 current sensors, or 8 I/O modules (one module corresponds to 4 sensors), or a
combination of current sensors and I/O modules, to each InSite Bus interface of the control unit.
Consider the maximum flat cable length.
Flat cable should not exert force on the sensor, otherwise measuring errors may occur.
Keep a distance of 5.5mm minimum between the flat cable and uninsulated live parts.
1. Mark the desired placement of the connector with a pen.
2. Press the flat cable into the cable duct of the connector housing.
3. Insert the connector into the connector housing at the marked position.
4. Press together using parallel pliers. Repeat the process at all other marks.
Attention
: In case one or more expansion modules have to be added to SCU200 / SCU200-W plug them all
first before assemblying on DIN-Rail bar.
1
2
3
4
4