
28
SCU200
INSITE ENERGY MANAGEMENT SYSTEM
4.Installation and wiring
• Warranty
Safe operation is ensured if assembly work has been carried out according to these user instructions.
Furthermore, the instructions in the manual must be observed.
• Authorized Personnel
Assembly, connection, and removal work should only be carried out by authorized and qualified
personnel.
4.1.Control unit
• Assembly on 35mm DIN-Rail
To assemble the control unit, perform steps 1 and 2.
To disassemble, perform steps 1,2 and 3.
1
1
2
2
3