ABB | SACE Emax 2
Management operations
3 - Description
20 | © 2023 ABB | 1SDH001000R0002 - ECN000297030
Continued from the previous page
8. Extract the disconnection crank from its housing See Figure 44.
9. Press the lock pushbutton and fit the handle into the moving part. In this phase, the moving part
will still be in the
DISCONNECT
position. See Figure 45.
Figure 44
2
1
Figure 45
10. Turn the crank clockwise until the pushbutton comes out and the indicator shows that the circuit-
breaker is in
TEST
position. See Figure 46.
Figure 46
11. Press lock pushbutton and turn handle clockwise until pushbutton projects and signaling device
indicates that circuit-breaker is in position
CONNECT
. See Figure 47.
1
2
Figure 47
Continued on the next page