&DOLEUDWLRQ
3.2.10. Checking the calibration position
69
3HAC 16578-1 Revision: E
© Copyri
ght
200
3-2007 ABB.
All rights reserved.
&KHFNLQJWKHFDOLEUDWLRQSRVLWLRQ
*HQHUDO
Check the calibration position before beginning any programming of the robot system. This
may be done in one of two ways:
•
Using a MoveAbsJ instruction with argument zero on all axes.
•
Using the Jogging window on the teach pendant.
8VLQJD0RYH$EV-LQVWUXFWLRQRQWKH7386&SOXV
This section describes how to create a program, which runs all the robot axes to their zero
position
8VLQJD0RYH$EV-LQVWUXFWLRQRQWKH)OH[3HQGDQW,5&
This section describes how to create a program, which runs all the robot axes to their zero
position.
$FWLRQ
1RWH
1. Create a new program.
2. Use MoveAbsJ.
3. Create the following program:
MoveAbsJ
[[0,0,0,0,0,0],[9E9,9E9,9E9,9E9,9E9,
9E9]]\NoEOffs, v1000, z50, Tool0
4. Run the program in manual mode.
5. Check that the calibration marks for the axes align
correctly. If they do not, update the revolution
counters!
The calibration marks are shown in
section
.
How to update the revolution
counters is detailed in section
6. Check that the positions of axes 1-2-3 are reached
and that the calibration marks on axes 4-5-6 are
aligned correctly.
If they are not, update the revolution counters!
Detailed in section
.
$FWLRQ
1RWH
1. On ABB menu tap Program Editor.
2. Create a new program.
3. Use MoveAbsJ in the Motion&Proc menu.
4. Create the following program:
MoveAbsJ
[[0,0,0,0,0,0],[9E9,9E9,9E9,9E9,9E9,
9E9]]\NoEOffs, v1000, z50, Tool0
5. Run the program in manual mode.
&RQWLQXHVRQQH[WSDJH
Summary of Contents for S4Cplus
Page 1: ...DOLEUDWLRQ 3HQGXOXP LQVWUXFWLRQ DOLEUDWLRQ HTXLSPHQW S4Cplus IRC5...
Page 2: ......
Page 6: ...7DEOH RI RQWHQWV 4 3HAC 16578 1 Revision E Copyright 2003 2007 ABB All rights reserved...
Page 84: ...QGH 82 3HAC 16578 1 Revision E Copyright 2003 2007 ABB All rights reserved...
Page 85: ......