1.3
Product documentation
1.3.1
Product documentation set
GUID-3AA69EA6-F1D8-47C6-A8E6-562F29C67172 v15
IEC07000220-4-en.vsd
P
la
n
n
in
g
&
p
u
rc
h
a
se
E
n
gi
n
e
e
rin
g
In
st
a
lli
n
g
C
o
m
m
is
si
o
n
in
g
O
p
e
ra
tio
n
M
ai
n
te
n
a
n
ce
D
e
co
m
m
is
si
o
n
in
g
D
e
in
st
a
lli
n
g
&
d
is
p
o
sa
l
Application manual
Operation manual
Installation manual
Engineering manual
Communication
protocol manual
Cyber security
deployment guideline
Technical manual
Commissioning manual
IEC07000220 V4 EN-US
Figure 1:
The intended use of manuals throughout the product lifecycle
The engineering manual contains instructions on how to engineer the IEDs using the various
tools available within the PCM600 software. The manual provides instructions on how to set
up a PCM600 project and insert IEDs to the project structure. The manual also recommends a
sequence for the engineering of protection and control functions, LHMI functions as well as
communication engineering for IEC 60870-5-103, IEC 61850, DNP3, LON and SPA.
The installation manual contains instructions on how to install the IED. The manual provides
procedures for mechanical and electrical installation. The chapters are organized in the
chronological order in which the IED should be installed.
The commissioning manual contains instructions on how to commission the IED. The manual
can also be used by system engineers and maintenance personnel for assistance during the
testing phase. The manual provides procedures for the checking of external circuitry and
energizing the IED, parameter setting and configuration as well as verifying settings by
secondary injection. The manual describes the process of testing an IED in a station which is
not in service. The chapters are organized in the chronological order in which the IED should be
commissioned. The relevant procedures may be followed also during the service and
maintenance activities.
The operation manual contains instructions on how to operate the IED once it has been
commissioned. The manual provides instructions for the monitoring, controlling and setting of
the IED. The manual also describes how to identify disturbances and how to view calculated
and measured power grid data to determine the cause of a fault.
Section 1
1MRK 500 125-UEN A
Introduction
6
Operation manual