![ABB REC650 ANSI Commissioning Manual Download Page 25](http://html1.mh-extra.com/html/abb/rec650-ansi/rec650-ansi_commissioning-manual_3388517025.webp)
2.3
Designed to communicate
IEC 61850/Function block
name
ANSI
Function description
Bay
REC650 (A01)
1CBA
REC650 (A02)
1CBAB
REC650 (A07)
BCAB
Station communication
IEC 61850 communication protocol, LAN1
1
1
1
DNP3.0 for TCP/IP communication protocol, LAN1
1
1
1
IEC61870-5-103
IEC60870-5-103 serial communication via ST
1
1
1
GOOSEINTLKRCV
Horizontal communication via GOOSE for interlocking
59
59
59
GOOSEBINRCV
GOOSE binary receive
4
4
4
ETHFRNT
ETHLAN1
GATEWAY
Ethernet configuration of front port, LAN1 port and
gateway
GOOSEDPRCV
GOOSE function block to receive a double point value
32
32
32
GOOSEINTRCV
GOOSE function block to receive an integer value
32
32
32
GOOSEMVRCV
GOOSE function block to receive a mesurand value
16
16
16
GOOSESPRCV
GOOSE function block to receive a single point value
64
64
64
2.4
Basic IED functions
IEC 61850/Function
block name
Function description
Basic functions included in all products
INTERRSIG
Self supervision with internal event list
1
SELFSUPEVLST
Self supervision with internal event list
1
SNTP
Time synchronization
1
TIMESYNCHGEN
Time synchronization
1
DTSBEGIN, DTSEND,
TIMEZONE
Time synchronization, daylight saving
1
IRIG-B
Time synchronization
1
SETGRPS
Setting group handling
1
ACTVGRP
Parameter setting groups
1
TESTMODE
Test mode functionality
1
CHNGLCK
Change lock function
1
TERMINALID
IED identifiers
1
PRODINF
Product information
1
PRIMVAL
Primary system values
1
Table continues on next page
1MRK 511 248-UEN -
Section 2
Available functions
17
Commissioning Manual