![ABB REACT 2 Series Product Manual Download Page 88](http://html.mh-extra.com/html/abb/react-2-series/react-2-series_product-manual_4161088.webp)
- 88 -
000901AG
5 - Installation
I
nput connection to PV generator (DC side)
Once preliminary checks have been carried out and no problems found with
WKHSKRWRYROWDLFV\VWHPDQGWKHFKDQQHOFRQ¿JXUDWLRQKDVEHHQVHOHFWHG
(parallel or independent) you may connect the inputs to the inverter.
Check for correct polarity in the input strings and absence of any leakage to ground in the PV
generator. When exposed to sunlight, the PV panels supply DC direct voltage to the inverter.
The inside of the inverter may only be accessed after the equipment has been disconnected
from the grid and from the photovoltaic generator.
:DUQLQJ 7KH LQYHUWHUV WR ZKLFK WKLV GRFXPHQW UHODWHV WR DUH :,7+287 ,62/$7,21
75$16)250(5WUDQVIRUPHUOHVV7KLVW\SHLQYROYHVWKHXVHRILQVXODWHGSKRWRYROWDLFSDQHOV
,(&&ODVV$5DWLQJDQGWKHQHHGWRPDLQWDLQWKHSKRWRYROWDLFJHQHUDWRUÀRDWLQJZLWK
respect to earth: no pole of the generator must be connected to earth.
To avoid risks of electrical shock, all wiring operations must be carried out with the DC disconnect
switch internal and external (if present, applying LOTO procedures on it) to OFF position and
with the external AC disconnect switch to OFF position (applying LOTO procedures on it).
)RUWKHFRQQHFWLRQVRIWKHVWULQJVWKHTXLFN¿WFRQQHFWRUVRQHIRUHDFKSROH
of each string) located on the lower side of the REACT2-UNO are used.
&RQQHFWDOOWKH
strings required by the system, always checking the
seal of the connectors.
The number of connections for each input channel is 2 pairs of
connectors.
*LYHDSXOOWHVWWRFRQ¿UPWKHFRQQHFWLRQLVVHFXUH
&RQQHFW GLUHFWO\ WKH LQGLYLGXDO LQSXW VWULQJV WR WKH 5($&7812 6KRXOG LW EH QHFHVVDU\ WR
PDNHSDUDOOHOVWULQJVRXWVLGHWKHLQYHUWHUWKHPD[LPXPFXUUHQWDOORZHGE\WKHLQGLYLGXDOTXLFN¿W
connector must be respected, which is 18A.
Polarity inversion can cause serious damage. Check polarity before connecting each string!
$FFRUGLQJWRWKHV\VWHPFRQ¿JXUDWLRQFKHFNWKHFRUUHFWVHWWLQJRIWKHFKDQQHOVWRLQGHSHQGHQWRU
in parallel mode. An incorrect setting of the input channels can lead to loss of energy production.
,IDQ\VWULQJLQSXWVDUHQRWUHTXLUHG\RXPXVWHQVXUHWKDWFRYHUVDUH
installed to the connectors, and install any which are missing. This is
necessary both for the inverter grade IP seal, and to avoid damage to
the free connector which may be used at a later time.
PV
BATTERY
DC SWITCH
GRID
BACKUP
METER
POWER
COMM.
18
19