
- 73 -
000969AG
5 - Installation
• Pass the phases cables trought the cable glands on the AC panel
11
.
• Fix the phases and neutral (if required) cable
lugs to the AC connection busbars
21
, paying
attention to the correspondence of the phases
with the labels, using the washers and the M10
nuts pre-installed on the busbar as shown in the
following diagram:
1
= cable lug
2
= flat washer
3
= spring washer
4
= M10 nut
The minimum recommended cross section for the phases conductors is 70 mm².
The cable lugs must be installed with a minimum tightening torque of 25Nm.
• Check the tightness of the AC cable glands at the end of the installation.
Make sure the cable glands are properly sealed to ensure to keep IP65 protection degree.
1 2
3 4
R
S
T
N