26
POWE RVA LU E 11T G 2
1-3 K VA B/S
—
Table 13: Battery runtime values
UPS
UPS+1EBM
UPS+2EBM
UPS+3EBM
UPS+4EBM
PowerValue 11T G2 1 kVA B
5/8.5/13.5/27
23/35/65/135
52/80/130/275 85/120/200/425 120/170/275/580
PowerValue 11T G2 1 kVA S
-
17/27/48/95
48/68/100/190 70/100/155/285 100/140/1995/380
PowerValue 11T G2 2 kVA B
5.5/9/14/28
25/38/68/145
55/85/135/280
90/130/210/425 125/180/290/600
PowerValue 11T G2 2 kVA S
-
18/28/48/105
50/70/110/210
80/110/165/315 110/150/210/410
PowerValue 11T G2 3 kVA B
5.5/9/14/29.5
16.5/25/45/105 35/53/90/195
55/85/135/295
80/115/185/405
PowerValue 11T G2 3 kVA S
-
10.5/16/28/65
28/45/70/130
50/72/110/190
70/100/140/250
—
11 2
Battery runtime
The table above shows battery autonomy
in minutes at 100 / 75 / 50 / 25% load at
nominal power factor.
The given runtimes are an estimate at 20°C; the
actual runtime of the system will depend on the
age of batteries, environmental conditions, etc.