04-3788_ABB_OPM_PVA11 6-10kVA-RT_EN_140423
Page 11/37 ABB
Modifications reserved
PowerValue 11 RT 10kVA
WARNING!
THIS TYPE OF CONNECTION MUST BE CARRIED OUT BY QUALIFIED
ELECTRICAL PERSONNEL.
CONNECT AN APPROPRIATE BREAKER BETWEEN UPS AND
BATTERIES.
1. Plug the battery module cable into the UPS battery connector in the rear of the UPS as indicated in
Figure 4.
Figure 4: Battery Module Connections
2.2.2.2 Standalone / Tower Installation
PowerValue 11 RT 6 kVA
1. Carefully rotate the LCD control panel of 90º to the right in the UPS and in the battery modules.
Figure 5: Display rotation
2. Rotate the units to the vertical position
3. Screw the supports to the sides of the unit.
Figure 6: Support positioning