1
Basic Installation
Step 1
Locate Suitable Installation Site
The NGC should be located close to the sample probe in an effort to
minimize the sample line length. See the table below for transport tubing
distances and lag times.
1/8” Transport Tubing Lag Time Considerations
Distance
Conditioning Module
Seconds
10’ (3.05 m)
2102023-XXX
36
20’ (6.10 m)
2102023-XXX
48
30’ (9.14 m)
2102023-XXX
60
50’ (15.20 m)
2102024-XXX
16
100’ (30.48 m)
2102024-XXX
23
150’ (45.72 m)
2102024-XXX
30
200’ (60.10 m)
2102024-XXX
36
250’ (76.20 m)
2102024-XXX
42
300’ (91.44 m)
2102024-XXX
50
350’ (106.68 m)
2102024-XXX
56
380’ (115.82 m)
2102024-XXX
60
Step 2
Mount the Unit
Mount the unit on a meter run, wall shelf, stand-alone pipe or inside a
cold weather enclosure.
NOTE:
The
NGC should not be connected to any section of pipeline
where cathodic protection exists.
The NGC has a grounding lug on the mounting neck of the enclosure.
This lug should be tied to a good earth ground with no smaller than
#12AWG wire.
Installation