![ABB Navigator 550 Operating Instructions Manual Download Page 19](http://html.mh-extra.com/html/abb/navigator-550/navigator-550_operating-instructions-manual_278019.webp)
Navigator 500
Sodium analyzer
3 Installation
OI/ASO550–EN Rev. G
17
3.5.1 Accessing the transmitter connection board
Referring to Fig. 3.13:
1. Using a suitable screwdriver, release door retaining screw
A
and open the transmitter door.
2. Release cover plate retaining screw
B
and remove cover
plate
C
.
3. Slide retaining clip
D
off blanking plug
E
and remove
the blanking plug.
4. Fit cable gland
F
and secure using nut
G
.
5. Remove gland cover
H
and route mains power supply
cable
J
through it.
6. Route the cable through cable gland
F
and into the
enclosure case.
7. Make connections to the power supply connection
terminals
K
.
8. Tighten gland cover
H
.
9. Refit cover plate
C
and secure it with retaining screw
B
.
10. Close the transmitter door and secure with door retaining
screw
A
.
Note.
Electrical connections to the wet-section connection
board are identified in the Section 3.4.3, page 15. Before
fitting cable glands, identify the connections required and
cable gland entries to be used.
Note.
Cable glands are supplied with single- and
twin-holed bushes. Use the single-holed bush for the
mains power cable.
Fig. 3.13 Accessing the transmitter board and making electrical
connections
I/O MODULE 3
SK5
C
A
B
D
E
F
G
J
H
K