QUICK START GUIDE
Page 7
© 2021 ABB. All rights reserved.
Step 11
-
Install Breakers and Fuses
(continued)
4.
Remove cover knockouts for installed positions.
5.
Replace Cover (2 thumb screws)
6.
Turn each Breaker ON
Snapak Breakers
1.
Remove Cover (2 thumb screws)
2.
Verify that each Breaker is OFF.
3.
Insert each Breaker fully into its position
•
oriented with ON position at top.
4.
Remove cover knockouts for installed positions.
5.
Replace Cover (2 thumb screws)
6.
Turn each Breaker ON
GMT Style Fuses
1.
Insert each GMT style fuse fully into its position
•
oriented as shown.
Load Breaker Positions
Battery or Load
Breaker Positions
Breaker Guard Orientation
Right Positions
Breaker Guard
Orientation
Breaker Retention Covers