
Note
Action
Dismantle and mounting tool set:
3HAC028920-001 Press Tool M
xx1700000090
Use the dismantle and mounting tool and pull the
shaft out.
3
Raise the lifting device to lower the front link ear
and give space to replace the bearing.
4
Removing the spherical roller bearing, link ear
Note
Action
Check that the link ear is in a position
where it is possible to apply the dismantle
and mounting tool. If not, adjust with the
lifting accessory.
1
xx1300000774
Unscrew the attachment screws securing
the end cover, remove end cover and radial
sealing with a screwdriver.
2
xx1300000775
Remove the o-ring.
3
Continues on next page
Product manual - IRB 6700Inv
401
3HAC058254-001 Revision: L
© Copyright 2017 - 2020 ABB. All rights reserved.
4 Repair
4.6.1 Replacing the spherical roller bearing
Continued
Summary of Contents for IRB 6700Inv
Page 1: ...ROBOTICS Product manual IRB 6700Inv ...
Page 16: ...This page is intentionally left blank ...
Page 40: ...This page is intentionally left blank ...
Page 182: ...This page is intentionally left blank ...
Page 672: ...This page is intentionally left blank ...
Page 704: ...This page is intentionally left blank ...
Page 720: ...This page is intentionally left blank ...
Page 722: ...This page is intentionally left blank ...
Page 729: ......