Operation Manual / 4 Product description / A130-H.. - A140-H
2 Removing and Installing / 2.3 Installing the turbocharger
© Copyright 2017 ABB. All rights reserved.
HZTL4030_EN
Revision D
May 2017
2.3
Installing the turbocharger
2.3.1
Inserting gaskets
CAUTION
Inserting the gaskets
Gaskets that are forgotten, damaged or improperly inserted will lead to oil
leaks.
u
Always use new gaskets and insert them carefully into the slot.
The oil is supplied (02) and drained (03) through the bracket (01).
The necessary sealing is provided by O-rings. The O-rings are not included in the ABB Turbo
Systems scope of delivery.
Fig. 9: Inserting gaskets into the bracket
01 Bracket
04 Slot for O-ring
02 Oil supply
05 O-rings
03 Oil drain
06 Pin (optional)
Pin (06) as installation safety device
Turbochargers can have an oil inlet either on their right or left side; the oil inlet position can
be different for the turbocharger fitted on the left and on the right engine bank.
A pin can be installed in every support as an installation safety device to prevent inadvertent
incorrect fitting. This pin fits into the respective slot on the foot of the bearing casing. In-
structions of the enginebuilder must be observed.
Page
13
/
91