Quality certificates and applicable standards
The following certificates and conformity declarations are available from ABB:
– ISO 9001 certificates stating that ABB Ltd in Napier has implemented and maintains a management system that
fulfils the requirements of the normative standards.
– EC conformity declaration.
– List of the standards the MV UPS complies with:
• IEC62477-2.
• IEC61000-6-2.
• WEEE.
• IEC60076 (for the medium voltage magnetics).
Items covered by delivery
Delivery comprises the following items:
– HiPerGuard low voltage Power Conversion Unit (PCU). This is a plinth with six enclosures already in
stalled and interwired. The six enclosures are: DCT enclosure, APS enclosure, Utility enclosure, 3 x
PE120 encloures.
– HiPerGuard Medium Voltage Magnetics (MVM) enclosure.
– Nuts, bolts, washers, brackets, plinth covers, and other metalwork parts required to interconnect PCU
to MVM enclosure.
– Communications and fan power cables to interconnect PCU to MVM enclosure.
– Fiber cable to interconnect MV UPS to Medium Voltage Switchgear enclosure.
For information on items supplied, see the shipping note.
Identifying the delivery
The HiPerGuard and accessories are identified by the type code printed on the rating label. The label is located on
the back of the PE120-1 enclosure door.
The label provides information on the HiPerGuard MV UPS rated voltage, frequency, rated current and auxiliary
power supply.