C H E C K L I S T S
FOX615
Installation
89
Please note:
The ETSI adapter sets contain the following installation material:
• Captive nuts (for the ETSI rack)
• Screws to fix the
−
adapters in the ETSI rack (captive nuts)
−
subrack, cable tray, fan unit, heat deflection shield etc. (whatever
applies) to the adapters (integrated M6 nuts)
4.6
Tools
The installation of the subrack and the cable tray requires no special tools.
The checklist below provides an overview of the most important standard
tools required for the installation.
4.7
Test equipment
The installation of the basic equipment (subrack, control unit, power units)
does not require special test equipment. Requirements for test equipment for
Table 15:
Checklist for tools (installation)
Description
Identifica-
tion
Quantity
Units
Remark
Screwdriver for standard slot head
screws
no. 1- 4
1
Units, subrack,
general use
Screwdriver for Phillips head screws
no. 1- 3
1
Units, subrack,
general use
Crimp tool for Mini-Fit HCS
TM
crimp
terminals (AWG 18 … AWG 24)
Parallel action Hand tool for 5556/
5558 Terminals
69008-0724
1
Alarm cables
Wire stripper
1
General use
Wire cutter
1
General use
Flat pliers
1
General use
Connection tool for MDF terminal
strips
1
Brand of MDF
Multimeter (Volt, Ampere, Ohm)
1
General use, to
check the polarity of
the power supply,
etc.
Wrist strap (bonding point M4 pre-
ferred)
1
Unit handling
Bench mats
1
Unit handling
Summary of Contents for FOX615
Page 1: ...ABB Power Systems FOX615 Installation User Manual ...
Page 6: ...4 FOX615 Installation ...
Page 10: ...8 FOX615 Installation ...
Page 96: ...A N N E X 94 FOX615 Installation ...
Page 97: ......