C H E C K L I S T S
88
FOX615
Installation
4.5
Installation material
Table 14:
Checklist for material
Description
Identifica-
tion
Quantity
Units
Remark
Screws, washers, crimp lug subrack
- Screws flat head (slot or Phillips) M6
4
per subrack
- Screws flat head (slot or Phillips) M6
4
per cable tray
- Washer for 6 mm screws
a
a. Only required if the subrack earthing is done via an earthing cable.
1
per bonding point
- Toothed washer for 6 mm screws
1
per bonding point
- Crimp lug for 6 mm screws for the
subrack earthing cable
(10 mm
2
cross section)
1
per bonding point
Screws FAMO1, FAMO1-F and heat
deflection
- Screws flat head (slot or Phillips) M6
4
per FAMO1
- Screws flat head (slot or Phillips) M6
4
per FAMO-F
- Screws flat head (slot or Phillips) M6
4
per heat deflection
shield R7AI
Screws ETSI adapters:
- Screws flat head (slot or Phillips) M6
4
per pair of ETSI
adapters 2 HE
- Screws flat head (slot or Phillips) M6
8
per pair of ETSI
adapters 9 HE
- Screws flat head (slot or Phillips) M6
10
per pair of ETSI
adapters 11 HE
Captive nuts (19-inch rack):
normally part of the
rack
- Subrack and cable tray
8
- FAMO1
4
- FAMO1-F
4
- Heat deflection shield R7AI
4
Cable ties
2
per signal cable
Latching clips for connectors
- provided with signal cables
- ordered separately for connector
(sets)
2
per standard con-
nector
Labels for cables
as required
Summary of Contents for FOX615
Page 1: ...ABB Power Systems FOX615 Installation User Manual ...
Page 6: ...4 FOX615 Installation ...
Page 10: ...8 FOX615 Installation ...
Page 96: ...A N N E X 94 FOX615 Installation ...
Page 97: ......