![ABB FC/S 1.1 Product Manual Download Page 44](http://html.mh-extra.com/html/abb/fc-s-1-1/fc-s-1-1_product-manual_3066044.webp)
43
ABB i-bus
®
EIB / KNX
Gain of proportional range for heating
Readjust time for heating (integral value) [sec.]
Gain of proportional range for cooling
Readjust time for cooling (integral value) [sec.]
Options for proportional range: – 0...65,535
(12,000)
Options for readjust time:
– 0...65,535
(900)
Setting the PI controller. This parameter is only visible if the option
“user-defined” is set for the parameters
Controller setting for heating
or
Controller setting for cooling
.
Sending of control value
Options: –
off
–
on
Sending of the control value on the EIB / KNX via the communication object
“Controller – Control value for PI controller”.
Period for cyclical sending of control value
Options [min.]: – 2...255
(2)
Setting the cyclic transmission time for the control value.
This parameter is only visible if the option “on” is set for the parameter
Sending of control value
.
Differential value for sending the control value
Options [%]: – 1...10
(3)
Setting the differential value at which the control value is sent in addition
to the cyclical sending. This parameter is only visible if the option “on” has
been set for the parameter
Sending of control value
.
Fig. 28: Parameter window: “Fan”
4.2.7 Parameter
window:
“Fan”
Project design and programming