![ABB Emax E1.2 Installation, Operation And Maintenance Instructions For The Installer And The User Download Page 57](http://html.mh-extra.com/html/abb/emax-e1-2/emax-e1-2_installation-operation-and-maintenance-instructions-for-the-installer-and-the-user_2082057.webp)
ABB | SACE Emax 2
Accessories | 1 - Preliminary considerations
55 | © 2017
ABB |
1SDH000999R0002 - ECN000058721 - Rev. B
Circuit-breaker dismantling
operations
To dismantle the accessories, the following parts must be removed from the circuit-breaker:
• Front cover (A) and protection (F) by removing the screws (B and C).
• For circuit-breakers in four-pole versions, the lateral protection (D) by removing the screws (C and E).
A
D
C
E
B
F
Figure 69 - Removing the front cover and protections
After reassembling the accessories, the parts previously disassembled must be reassembled as indicated:
• Front cover (A) and protection (F) by screwing the fixing screws (B and C). Lock with tightening torque 0.8
Nm - 7 lb in (B) and 1.5 Nm - 13 lb in (C).
• For circuit-breakers in four-pole versions, the lateral protection (D) by removing the screws (C and E).
Tighten with tightening torque 1.5 Nm - 13 lb in.
A
D
B
C
E
F
Figure 70 - Assembly of front cover and protections
8mm
0.5 2.5mm
2
2
1
0.5 1.5mm
2
20 AWG 16 AWG
20 AWG 14 AWG
Max O 3.3mm
Max O . 3
0 1 "
Max O 3.3mm
Max O . 3
0 1 "
0.31"
8mm
0.31"
Figure 71 - Wiring with stripping and cross-sections