![ABB Emax E1.2 Installation, Operation And Maintenance Instructions For The Installer And The User Download Page 11](http://html.mh-extra.com/html/abb/emax-e1-2/emax-e1-2_installation-operation-and-maintenance-instructions-for-the-installer-and-the-user_2082011.webp)
ABB | SACE Emax 2
Emax E1.2 circuit-breakers | 2 - Transport and checking on receipt
9 | © 2017
ABB |
1SDH000999R0002 - ECN000058721 - Rev. B
Storage method
Place the packaging (circuit-breakers and / or fixed parts) on a horizontal plane, not in contact with the floor.
If the circuit-breaker has been removed and reinserted in the package ensure, prior to storage that:
• the circuit-breaker is in the open position and springs discharged. See the chapter "Description - circuit-
breaker opening/closing operations" on page 15
• the circuit-breaker is protected and locked in its original packaging
Figure 4