ABB | SACE Emax 2
Emax E1.2 circuit-breakers | 4 - Description
19 | © 2017
ABB |
1SDH000999R0002 - ECN000058721 - Rev. B
Continued from the previous page
5. Turn the crank clockwise until the pushbutton comes out and the indicator shows that the circuit-
breaker is in
TEST
position. See Figure 34.
Figure 34
6. Press the lock button and then rotate the crank clockwise until the button comes out and the indicator
shows that the circuit-breaker is in the
CONNECT
position. See Figure 35.
2
1
Figure 35
7. Extract the crank. See Figure 36.
8. Replace the crank in its housing See Figure 37.
Figure 36
Figure 37
Continued on the next page