Section-5
04-3006_S5_OPM_ABB_DPA_UPSCALE_RI_10-80kW_EN_150316.doc
Page 14/14 ABB
Modifications reserved
7.
Open Maintenance Bypass (IA1) by turning it to position “OFF”. The load is now supplied by the static
bypass of all three Modules. Check LED-indicators on control panels.
8.
Transfer load to Inverter-
Mode by means of COMMAND “LOAD TO INVERTER” on any one of
control panels. On LCD: “LOAD PROTECTED” will appear and the LED
-indicator will indicate as
shown below:
LED Indicator
Colour
LINE 1
Green
LINE 2
Green
BYPASS
OFF
INVERTER
Green
BATTERY
Green
THE LOAD IS NOW PROTECTED BY THE DPA UPScale
TM
Summary of Contents for DPA Upscale RI Series
Page 27: ......
Page 28: ......
Page 29: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 51: ......
Page 52: ......
Page 53: ......