![ABB CGWB 13 Operator'S Manual Download Page 9](http://html.mh-extra.com/html/abb/cgwb-13/cgwb-13_operators-manual_4010009.webp)
7
Unpacking
Unpacking
Step Action
1
Unpack the heatable sample gas line and the temperature controller.
2
Make sure that any accompanying accessories do not get lost.
3
Check the contents of the delivery to ensure that it is complete by
comparing the actual goods with the dispatch note.
NOTE
Keep the packing material for possible future transport.
If damage has occurred during transport due to improper handling, please
submit a damage report to the transport institution (railway company,
post office, forwarding agency) within seven days.
C
H A P T E R
1
Assembly