![ABB CGWB 13 Operator'S Manual Download Page 10](http://html.mh-extra.com/html/abb/cgwb-13/cgwb-13_operators-manual_4010010.webp)
8
Assembling or Shortening the
Heatable Sample Gas Line
The heatable sample gas lines of the types CGWB 13 and TBL 01-C can
be shortened.
Important Components of the Sample Gas Line
(Dimensions in mm)
1
Heating cable
2
Contact points with depressions
3
Process line
The contact points of the heating cable are approx. 580-600 mm apart.
WARNING
Danger of failure of the heatable sample gas line!
Ensure that you carry out all the requisite assembly and shortening
work as described in these instructions. The heating of the heatable
sample gas line must work perfectly over the entire length. Otherwise
there is a danger of all the downstream modules and devices being
damaged by the formation of condensate.