22 Mechanical installation
5.
Frames R1 to R3:
Attach the top and bottom U-brackets to the drive.
6.
Frames R1 to R3:
First attach the side brackets (a) to the top and bottom U-
brackets with M6 nuts. Then attach the tightening brackets (b) to the both ends
with M5×20 screws.
4 × M6 nut
6 N·m
4 × M5×20 screw
3 N·m
R1…R3: 4 × M6 nut
6 N·m
a
a
b
b
Note:
Attach this end of the side
brackets to the bottom U-bracket to
make sure that the sealing is tight.
Summary of Contents for ACX580-01 R1
Page 1: ...ABB drives Supplement ACX580 01 R1 R3 Flange mounting kit installation ...
Page 4: ......
Page 12: ...12 Hardware description ...
Page 30: ...30 Dimension drawings ACX580 01 frame R1 Flange mounting kit 3AXD50000131310 ...
Page 31: ...Dimension drawings 31 Hood is needed for UL Type 12 drives 3AXD50000131242 ...
Page 32: ...32 Dimension drawings Attaching points and hole dimensions 3AXD50000038098 ...
Page 33: ...Dimension drawings 33 ACX580 01 frame R2 Flange mounting kit 3AXD50000131327 ...
Page 34: ...34 Dimension drawings Hood is needed for UL Type 12 drives 3AXD50000130863 ...
Page 35: ...Dimension drawings 35 Attaching points and hole dimensions 3AXD50000038111 ...
Page 36: ...36 Dimension drawings ACX580 01 frame R3 Flange mounting kit 3AXD50000131143 ...
Page 37: ...Dimension drawings 37 Hood is needed for UL Type 12 drives 3AXD50000130870 ...
Page 38: ...38 Dimension drawings Attaching points and hole dimensions 3AXD50000038117 ...
Page 40: ...Contact us www abb com drives www abb com drivespartners 3AXD50000119189 RevA EN 2017 10 10 ...