![ABB ACX Commissioning Instruction Download Page 23](http://html.mh-extra.com/html/abb/acx/acx_commissioning-instruction_4308023.webp)
CI/ACX-EN Rev. D
ACX Analyzer System Commissioning Instruction
23
Items Delivered
Standard Equipment
Quantity Description
1
Analyzer cabinet or
Mounting plate with separate electrical distribution cabinet
System documentation (provided in a ring binder, see page 6)
Additional Items
Delivered Per Order
Quantity Description
1
Gas sampling probe tube
Type 40 (unheated) or
Type 40W (partially heated) or
Type 42 (heated) or
Gas sampling probe
Type 2 optionally with separate protective case or
Type F
1
Filter unit type PFE2 or PFE3 with ring heater or heating sleeve
1
Sample gas line type TBL01-S or TBL01-C (heated)
1
Back-purging unit 1-stage or 2-stage with compressed-air hoses
1
Hydrogen switch-over station with cylinder pressure reducers on
mounting plate (for AO2000-Fidas24)
1
Reagent supply bottle
1
Condensate collection bottle
1
Wear parts set
‘Hydrogen monitoring of
the analyzer cabinet’
option
Quantit
y
Description
1
Unipoint gas warning center
1
Contactor for disconnecting the power supply to the analyzer cabinet
1
Contactor for disconnecting the UPS if the system is prepared for a UPS.
1
Unipoint Multilingual Manual CD
1
Sensepoint Manuals CD
The gas sensor and the H
2
safety valve are securely installed in or on the analyzer
cabinet.