![ABB ACX Commissioning Instruction Download Page 21](http://html.mh-extra.com/html/abb/acx/acx_commissioning-instruction_4308021.webp)
CI/ACX-EN Rev. D
ACX Analyzer System Commissioning Instruction
21
Power Supply Requirements,
continued
Fuses
-F10
Power supply / leakage current indicator (option)
25 A/30 mA
-F20
Power supply UPS / leakage current indicator (option)
25 A/30 mA
-F01
Lighting, service socket, ventilation fan or cooling unit
6 A or 16 A
-F02
Heated probe tube, heated filter unit, back-purging unit, test
gas connection valves
10 A or 16 A
or 6 A
-F03
Heated sample gas line
16 A
-F04
NO
2
/NO converter
6 A
-F05
AO2000-Fidas24, air catalyst
6 A
-F06
Sample gas cooler, sample gas feed unit
6 A
-F07
AO2000 central unit, power supply
6 A
-F11
Temperature controller
T 2 A
-F12
Temperature controller
T 2 A
-F13
Temperature controller
T 2 A
-F14
Emergency purging AO2000-Fidas24
T 0.5 A
-F17
Test gas valve 1
T 0,5 A
-F18
Test gas valve 2
T 0,5 A
-F19
Test gas valve 3
T 0,5 A
-F22
Filter unit 2nd sampling point
10 A or 16 A
-F23
Heated sample gas line 2nd sampling point
16 A