Make sure that …
If the drive is connected to a network other than a symmetrically grounded TN-S system: You have
done all the required modifications (for example, you may need to disconnect the EMC filter or ground-
to-phase varistor). See the electrical installation instructions in the supply unit manual.
The enclosures of the equipment in the cabinet have proper galvanic connection to the cabinet protective
earth (ground) busbar; The connection surfaces at the fastening points are bare (unpainted) and the
connections are tight, or separate grounding conductors have been installed.
The main circuit connections inside the drive cabinet correspond to the circuit diagrams.
The control unit has been connected. See the circuit diagrams.
Appropriate AC fuses and main disconnector are installed.
There is an adequately sized protective earth (ground) conductor(s) between the drive and the
switchboard, the conductor is connected to correct terminal, and the terminal is tightened to the correct
torque.
Proper grounding has also been measured according to the regulations.
The input power cable is connected to the correct terminals, the phase order is correct, and the terminals
are tightened to the correct torque.
There is an adequately sized protective earth (ground) conductor between the motor and the drive,
and the conductor is connected to the correct terminal, and the terminal is tightened to the correct
torque.
Proper grounding has also been measured according to the regulations.
The motor cable is connected to the correct terminals, the phase order is correct, and the terminals
are tightened to the correct torque.
The motor cable is routed away from other cables.
No power factor compensation capacitors are connected to the motor cable.
If an external brake resistor is connected to the drive: There is an adequately sized protective earth
(ground) conductor between the brake resistor and the drive, and the conductor is connected to the
correct terminal, and the terminals are tightened to the correct torque.
Proper grounding has also been measured according to the regulations.
If an external brake resistor is connected to the drive: The brake resistor is connected to the correct
terminals, and the terminals are tightened to the correct torque.
If an external brake resistor is connected to the drive: The brake resistor cable is routed away from
other cables.
The control cables are connected to the correct terminals, and the terminals are tightened to the correct
torque.
If a drive bypass connection will be used: The direct-on-line contactor of the motor and the drive output
contactor are either mechanically and/or electrically interlocked, that is, they cannot be closed at the
same time. A thermal overload device must be used for protection when bypassing the drive. Refer to
local codes and regulations.
There are no tools, foreign objects or dust from drilling inside the drive.
The area in front of the drive is clean: the drive cooling fan cannot draw any dust or dirt inside.
Cover(s) of the motor connection box are in place. Cabinet shrouds are in place and doors are closed.
If the drive is stored for longer than one year: The electrolytic DC capacitors in the DC link of the drive
are reformed. Refer to
Converter module capacitor reforming instructions
(3BFE64059629 [English]).
The motor and the driven equipment are ready for power-up.
68 Installation checklist
Summary of Contents for ACS880-604
Page 1: ... ABB INDUSTRIAL DRIVES ACS880 604 3 phase brake units as modules Hardware manual ...
Page 2: ......
Page 4: ......
Page 10: ...10 ...
Page 34: ...Overview of kits 34 Cabinet construction ...
Page 35: ...Stage 1 Installation of common parts Cabinet construction 35 10 ...
Page 36: ...Stage 2A Installation of DC busbars 1 without DC switch or charging 36 Cabinet construction ...
Page 37: ...Stage 2B Installation of DC busbars 1 with DC switch and charging Cabinet construction 37 10 ...
Page 39: ...Stage 4 Installation of incoming resistor busbars cable connection Cabinet construction 39 10 ...
Page 40: ...Stage 5 Installation of mounting plates and cable entries 40 Cabinet construction ...
Page 41: ...Stage 6 Installation of support plate Cabinet construction 41 10 ...
Page 42: ...Stage 7 Installation of shrouding 42 Cabinet construction ...
Page 43: ...Stage 8 Installation of brake chopper module Cabinet construction 43 10 ...
Page 44: ...44 ...
Page 48: ...48 ...
Page 56: ...56 ...
Page 74: ...74 ...
Page 76: ...76 ...
Page 112: ...Frame R8i 112 Dimension drawings ...
Page 113: ...Dimension drawings 113 ...
Page 114: ...Control electronics BCU control unit 114 Dimension drawings ...
Page 123: ...Miscellaneous components Quick connector for frame R8i Dimension drawings 123 ...
Page 124: ...124 Dimension drawings ...
Page 125: ... Insertion extraction ramp for frame R8i modules Dimension drawings 125 ...
Page 126: ...126 Dimension drawings ...
Page 127: ... CRBB 4 400 188 cooling fan 218 Dimension drawings 127 ...
Page 128: ...128 Dimension drawings ...