-40 … +70 °C
-40 … +70 °C
0 … +45 °C
(+32 … +113 °F), no con-
densation allowed. Output
derated in the range
+45 … +55 °C
(+113 … +131 °F).
Air temperature
(-40 … +158 °F)
(-40 … +158 °F)
Maximum 95%, no con-
densation allowed
Maximum 95%, no con-
densation allowed
Maximum 95%, no con-
densation allowed
Relative humidity
No condensation allowed. Maximum allowed relative humidity is 60% in the presence
of corrosive gases.
IEC 60721-3-2
IEC 60721-3-1
IEC/EN 60721-3-3:2002:
Classification of environ-
mental conditions - Part 3-
3: Classification of groups
of environmental paramet-
ers and their severities -
Stationary use of weather
protected locations
Contamination
Class 2C2
Class 1C2
Class 3C2
Chemical gases
Class 2S2
Class 1S3 (packing must
support this, otherwise
1S2)
Class 3S1
Solid particles
No conductive dust al-
lowed.
IEC/EN 60721-3-1:1997
IEC/EN 60721-3-1:1997
IEC 61800-5-1
Vibration
IEC 60068-2-6:2007,
EN 60068-2-6:2008 Envir-
onmental testing Part 2:
Tests -Test Fc: Vibration
(sinusoidal)
10 … 57 Hz, max.
0.075 mm amplitude
57 … 150 Hz 1
g
Tested in a typical cabinet
assembly according to:
Max. 1 mm (0.04 in.)
(peak value, 5 … 13.2 Hz),
max. 0.7
g
(13.2 … 100 Hz) sinusoidal
With packing max.
100 m/s
2
(330 ft./s
2
) 11 ms
With packing max.
100 m/s
2
(330 ft./s
2
) 11 ms
Not allowed
Shock
IEC 60068-2-27:2008,
EN 60068-2-27:2009
Environmental testing -
Part 2-27: Tests - Test Ea
and guidance: Shock
Technical data 107
Summary of Contents for ACS880-604
Page 1: ... ABB INDUSTRIAL DRIVES ACS880 604 3 phase brake units as modules Hardware manual ...
Page 2: ......
Page 4: ......
Page 10: ...10 ...
Page 34: ...Overview of kits 34 Cabinet construction ...
Page 35: ...Stage 1 Installation of common parts Cabinet construction 35 10 ...
Page 36: ...Stage 2A Installation of DC busbars 1 without DC switch or charging 36 Cabinet construction ...
Page 37: ...Stage 2B Installation of DC busbars 1 with DC switch and charging Cabinet construction 37 10 ...
Page 39: ...Stage 4 Installation of incoming resistor busbars cable connection Cabinet construction 39 10 ...
Page 40: ...Stage 5 Installation of mounting plates and cable entries 40 Cabinet construction ...
Page 41: ...Stage 6 Installation of support plate Cabinet construction 41 10 ...
Page 42: ...Stage 7 Installation of shrouding 42 Cabinet construction ...
Page 43: ...Stage 8 Installation of brake chopper module Cabinet construction 43 10 ...
Page 44: ...44 ...
Page 48: ...48 ...
Page 56: ...56 ...
Page 74: ...74 ...
Page 76: ...76 ...
Page 112: ...Frame R8i 112 Dimension drawings ...
Page 113: ...Dimension drawings 113 ...
Page 114: ...Control electronics BCU control unit 114 Dimension drawings ...
Page 123: ...Miscellaneous components Quick connector for frame R8i Dimension drawings 123 ...
Page 124: ...124 Dimension drawings ...
Page 125: ... Insertion extraction ramp for frame R8i modules Dimension drawings 125 ...
Page 126: ...126 Dimension drawings ...
Page 127: ... CRBB 4 400 188 cooling fan 218 Dimension drawings 127 ...
Page 128: ...128 Dimension drawings ...