112 Installation checklist
Check that...
The ambient operating conditions meet the specifications given in chapter
The cabinet has been fixed to floor, and if necessary due to vibration etc, also from top to the wall or
roof.
The cooling air flows freely, and air recirculation inside the cabinet is not possible.
There is sufficient free space around the drive cabinet. See section
cubicle – 2×D7T, 12-pulse, Rittal TS 8
on page
.
There is an adequately sized protective earth (ground, PE) conductor between the drive and the
switchboard.
The conductor has been connected to appropriate terminal.
Connection of the PE conductor is tight: Pull the conductors to check.
Proper grounding has been measured according to the local regulations.
The enclosures of the equipment in the cabinet have proper galvanic connection to the cabinet
protective earth (ground) busbar; The connection surfaces at the fastening points are bare
(unpainted) and the connections are tight, or separate grounding conductors have been installed and
the connections are tight (pull the conductors to check).
The main circuit connections inside the drive cabinet correspond to the circuit diagrams.
The supply voltage matches the nominal input voltage of the unit. Check the type designation label.
The input power cable has been connected to the appropriate terminals, the phase order is right, and
the terminals have been tightened. (Pull the conductors to check.)
Appropriate AC fuses and main disconnector have been installed.
The control cables (if any) have been connected to the appropriate terminals, and the terminals have
been tightened. (Pull the conductors to check.)
There are no tools, foreign objects or dust from drilling inside the cabinet.
The installation of the inverter modules and motor cable has been checked. See
ACS880-104
inverter modules Hardware manual
(3AUA0000104271 [English]).
All shrouds and covers are in place. Cabinet doors have been closed.
Summary of Contents for ACS880-304 +A018
Page 1: ...ABB industrial drives Hardware manual ACS880 304 A018 diode supply modules ...
Page 4: ......
Page 14: ...14 ...
Page 52: ...52 Cabinet construction Kits for 2 D7T 12 pulse Rittal TS 8 ...
Page 53: ...Cabinet construction 53 Stage 1 Installation of common parts ...
Page 54: ...54 Cabinet construction Stage 2 Module installation parts ...
Page 55: ...Cabinet construction 55 Stage 3 Module installation ...
Page 56: ...56 Cabinet construction Stage 4 AC busbars to the module ...
Page 57: ...Cabinet construction 57 Stage 5 DC busbars to the module ...
Page 58: ...58 Cabinet construction Stage 6 Shroud installation ...
Page 60: ...60 Cabinet construction Kits for 1 D8T 6 pulse Rittal TS 8 ...
Page 61: ...Cabinet construction 61 Stage 1 Installation of common parts ...
Page 62: ...62 Cabinet construction Stage 2 Module installation parts ...
Page 63: ...Cabinet construction 63 Stage 3 Quick connector installation ...
Page 64: ...64 Cabinet construction Stage 4 DC busbars to the module ...
Page 65: ...Cabinet construction 65 Stage 5 AC busbars to quick connector ...
Page 66: ...66 Cabinet construction Stage 6 AC busbar ...
Page 67: ...Cabinet construction 67 Stage 7 Module installation ...
Page 68: ...68 Cabinet construction Stage 8 Shroud installation ...
Page 70: ...70 Cabinet construction Kits for 1 D8T 6 pulse generic cabinet ...
Page 72: ...72 Cabinet construction Kits for 2 D8T 6 pulse Rittal TS 8 ...
Page 73: ...Cabinet construction 73 Stage 1 Installation of common parts ...
Page 74: ...74 Cabinet construction Stage 2 Module installation parts ...
Page 75: ...Cabinet construction 75 Stage 3 Quick connector installation ...
Page 76: ...76 Cabinet construction Stage 4 DC busbars ...
Page 77: ...Cabinet construction 77 Stage 5 AC busbars to quick connector ...
Page 78: ...78 Cabinet construction Stage 6 AC fuse busbars installation ...
Page 79: ...Cabinet construction 79 Stage 7 Module installation ...
Page 80: ...80 Cabinet construction Stage 8 Shroud installation ...
Page 82: ...82 Cabinet construction Kits for 2 D8T 6 and 12 pulse generic cabinet ...
Page 84: ...84 Cabinet construction Kits for 2 D8T 12 pulse Rittal TS 8 ...
Page 85: ...Cabinet construction 85 Stage 1 Installation of common parts ...
Page 86: ...86 Cabinet construction Stage 2 Module installation parts ...
Page 87: ...Cabinet construction 87 Stage 3 Quick connectors ...
Page 88: ...88 Cabinet construction Stage 4 DC busbar installation ...
Page 89: ...Cabinet construction 89 Stage 5 AC busbars to quick connector ...
Page 90: ...90 Cabinet construction Stage 6 AC busbars to main AC installation ...
Page 91: ...Cabinet construction 91 Stage 7 Module installation DC connection flanges ...
Page 92: ...92 Cabinet construction Stage 8 Shroud installation ...
Page 94: ...94 Cabinet construction Kits for 3 D8T 6 pulse generic cabinet ...
Page 118: ...118 Start up ...
Page 125: ...Maintenance 125 2 3 ...
Page 127: ...Maintenance 127 2 3 ...
Page 132: ...132 Maintenance 4 5 6 7 8 6 10 10 ...
Page 140: ...140 Maintenance 5 a c b 6 d e 9 ...
Page 144: ...144 Maintenance 6 b c 7 d 8 ...
Page 214: ...214 Ordering information ...
Page 240: ...240 Dimension drawings Dimensions of D7T supply module ...
Page 241: ...Dimension drawings 241 Dimensions of D8T supply module ...
Page 244: ...244 Dimension drawings Dimensions of BCU control unit ...
Page 257: ...Dimension drawings 257 Oval toroid kit ...
Page 258: ...258 Dimension drawings Oval toroid ...
Page 259: ...Dimension drawings 259 Dimensions of CVAR board UL CSA Dimensions in mm 1 mm 0 0394 in ...
Page 260: ...260 Dimension drawings ...
Page 280: ...www abb com drives www abb com drivespartners 3AXD50000010104 Rev C EN 2015 12 03 Contact us ...