Maintenance intervals
The table below shows the maintenance tasks which can be done by the end user. The
complete maintenance schedule is available on the Internet (
).
For more information, consult your local ABB Service representative
(
Years from start-up
Maintenance task/object
…
12
11
10
9
8
7
6
5
4
3
2
1
0
Coolant
R
R
Coolant draining and replacement
P
P
P
P
P
P
Checking coolant quality
P
P
P
P
P
P
P
P
P
P
P
P
P
Checking coolant antifreeze concentration
Coolant pump
R
R
Pump
R
R
Pump motor
R
R
Expansion tank
Cooling fans
R
Supply module fan (230 V)
R
R
Supply module fan (115 V)
Batteries
R
Control panel battery
R
R
Control unit battery
Connections and environment
P
P
P
P
P
P
P
P
P
P
P
P
P
Quality of supply voltage
Spare parts
I
I
I
I
I
I
I
I
I
I
I
I
I
Spare parts
P
P
P
P
P
P
P
P
P
P
P
P
P
DC circuit capacitor reforming (spare mod-
ules and spare capacitors)
Inspections
I
I
I
I
I
I
I
I
I
I
I
I
I
Checking tightness of cable and busbar
terminals. Tightening if needed.
I
I
I
I
I
I
I
I
I
I
I
I
I
Checking ambient conditions (dustiness,
corrosion, temperature)
I
I
I
I
I
I
I
I
I
I
I
I
I
Checking coolant pipe connections
Symbols
Inspection
(visual inspection and maintenance action if needed)
I
Performance
of on/off-site work (commissioning, tests, measurements or other work)
P
Replacement
R
70 Maintenance
Summary of Contents for ACS880-207LC
Page 1: ... ABB INDUSTRIAL DRIVES ACS880 207LC IGBT supply units Hardware manual ...
Page 2: ......
Page 4: ......
Page 10: ...10 ...
Page 52: ...52 ...
Page 62: ...62 ...
Page 74: ...4 74 Maintenance ...
Page 79: ...4 5 6 Maintenance 79 ...
Page 96: ...Internal cooling circuit data See chapter Internal cooling circuit 96 Technical data ...
Page 98: ...98 Technical data ...
Page 99: ... 600 mm wide incoming cubicle or input cubicle Technical data 99 ...
Page 100: ... 1000 mm wide input cubicle 100 Technical data ...
Page 108: ...108 ...
Page 118: ...118 ...