![ABB ACS880-204LC Hardware Manual Download Page 177](http://html.mh-extra.com/html/abb/acs880-204lc/acs880-204lc_hardware-manual_2649177.webp)
The higher the concentration of heat transfer fluid, the higher the viscosity of the coolant.
This results in a higher pressure loss in the system. See
.
The nominal current ratings of drive system modules apply to an Antifrogen® L / water
solution of 25/75% (volume). With the Antifrogen® L concentration between 25% and 50%,
the drive output current must be derated by 1/3 percentage point per 1 p.p. increase in
Antifrogen® L concentration. The drawing below shows the derating factor
(k)
in relation to
Antifrogen® L concentration.
1.00
0.95
25%
k
0.90
30%
35%
40%
45%
50%
Antifrogen® L concentration
Incoming coolant temperature:
•
0…40 °C (32…104 °F): no drive output current derating required
•
40…45 °C (104…113 °F): drive output current must be derated by 2 percentage points
per 1 °C (1.8 °F) temperature increase, as shown by curve (a).
•
45…50 °C (113…122 °F):
•
If components with a maximum operating temperature of 55 °C (131 °F) are installed
in the same space as the drive modules, drive output current must be derated by
6 percentage points per 1 °C (1.8 °F) temperature increase, as shown by curve (c).
•
If there are no components with a maximum operating temperature of 55 °C (131 °F)
installed in the same space as the drive modules, drive output current must be
derated by 2 percentage points per 1 °C (1.8 °F) temperature increase, as shown
by curve (b).
The drawing below shows the derating factor
(k)
in relation to coolant temperature.
Internal cooling circuit 131
The drawing below shows the derating factor (
k
) in relation to coolant temperature.
Condensation is not allowed. The minimum coolant temperature to avoid condensation (at
an atmospheric pressure of 1 bar) is shown below as a function of relative humidity (f) and
ambient temperature (
T
air
).
Maximum temperature rise:
Depends on heat losses and mass flow. Typically 5 °C
(9 °F) with nominal losses and flow.
Pressure limits
Base pressure:
100 … 150 kPa (recommended); 200 kPa (maximum). “Base pressure”
denotes the pressure of the system compared with the atmospheric pressure when the
cooling circuit is filled with coolant.
Air counterpressure in the expansion tank:
40 kPa
Design pressure:
600 kPa
Nominal pressure difference
(between main in/out lines)
:
120 kPa
Maximum pressure difference
(between main in/out lines)
:
200 kPa
T
air
(°C)
Min. T
coolant
(°C)
I
= 95%
I
= 80%
I
= 65%
I
= 50%
I
= 40%
5
4.3
1.9
-0.9
-4.5
-7.4
10
9.2
6.7
3.7
-0.1
-3.0
15
14.2
11.5
8.4
4.6
1.5
20
19.2
16.5
13.2
9.4
6.0
25
24.1
21.4
17.9
13.8
10.5
30
29.1
26.2
22.7
18.4
15.0
35
34.1
31.1
27.4
23.0
19.4
40
39.0
35.9
32.2
27.6
23.8
45
44.0
40.8
36.8
32.1
28.2
50
49.0
45.6
41.6
36.7
32.8
55
53.9
50.4
46.3
42.2
37.1
= Not allowed as standard but the coolant temperature must be 4 °C (39 °F) or above.
Consult an ABB representative if operation below coolant temperature 4 °C is required.
Example:
At an air temperature of 45 °C and relative humidity of 65% the coolant temperature may
not be below +36.8 °C
T
1.00
0.90
+40 °C
+104 °F
k
0.80
0.70
0.60
+45 °C
+113 °F
+50 °C
+122 °F
(a)
(b)
(c)
ACS880LC_coolant temp derating curve.pdf
Condensation is not allowed. The minimum coolant temperature to avoid condensation (at
an atmospheric pressure of 1 bar) is shown below as a function of relative humidity (RH)
and ambient temperature (
T
air
).
Min. T
coolant
(°C)
T
air
(°C)
RH = 40%
RH = 50%
RH = 65%
RH = 80%
RH = 95%
-7.4
-4.5
-0.9
1.9
4.3
5
Internal cooling circuit 177
Summary of Contents for ACS880-204LC
Page 1: ... ABB INDUSTRIAL DRIVES ACS880 204LC IGBT supply modules Hardware manual ...
Page 2: ......
Page 4: ......
Page 16: ...16 ...
Page 32: ...32 ...
Page 39: ...Overview of kits Cabinet construction 39 ...
Page 40: ...Stage 1 Installation of common parts 40 Cabinet construction ...
Page 41: ...Stage 2 Installation of LCL side plates and common AC bus Cabinet construction 41 ...
Page 42: ...Stage 3 Installation of brackets for Flat PLS holder 42 Cabinet construction ...
Page 43: ...Stage 4A BLCL 15LC 7 AC connection and fuse busbars installation Cabinet construction 43 ...
Page 44: ...Stage 4B BLCL 24LC 7 AC connection and fuse busbars installation 44 Cabinet construction ...
Page 46: ...Stage 6 LCL choke and LCL choke busbar installation 46 Cabinet construction ...
Page 50: ...Stage 9 Installation of LCL shroud kit 50 Cabinet construction ...
Page 52: ...Overview of kits 52 Cabinet construction ...
Page 53: ...Stage 1 Installation of common parts Cabinet construction 53 ...
Page 54: ...Stage 2 Installation of LCL side plates and common AC bus 54 Cabinet construction ...
Page 55: ...Stage 3 Installation of brackets for Flat PLS holder Cabinet construction 55 ...
Page 56: ...Stage 4 AC connection and fuse busbars installation 56 Cabinet construction ...
Page 58: ...Stage 6 LCL choke and LCL choke busbar installation 58 Cabinet construction ...
Page 61: ...Stage 9 Installation of LCL shroud kit Cabinet construction 61 ...
Page 65: ...Overview of kits Cabinet construction 65 ...
Page 66: ...Stage 1 Installation of common parts 66 Cabinet construction ...
Page 67: ...Stage 2 Side plate module mounting mechanics and quick connectors Cabinet construction 67 ...
Page 68: ...Stage 3 Flat PLS support kit for AC and common AC connection busbars 68 Cabinet construction ...
Page 69: ...Stage 4 Fan heat exchanger and cooling components Cabinet construction 69 ...
Page 70: ...Stage 5A Installation of DC busbars 70 Cabinet construction ...
Page 72: ...Stage 6 Module installation 72 Cabinet construction ...
Page 73: ...Stage 7 Installation of shrouding Cabinet construction 73 ...
Page 77: ...Overview of kits Cabinet construction 77 ...
Page 78: ...Stage 1 Installation of common parts 78 Cabinet construction ...
Page 79: ...Stage 2 Side plate module mounting mechanics and quick connectors Cabinet construction 79 ...
Page 80: ...Stage 3 Flat PLS support kit for AC and common AC connection busbars 80 Cabinet construction ...
Page 81: ...Stage 4 Fan heat exchanger and cooling components Cabinet construction 81 ...
Page 82: ...Stage 5A Installation of DC busbars 82 Cabinet construction ...
Page 84: ...Stage 6 Module installation 84 Cabinet construction ...
Page 85: ...Stage 7 Installation of shrouding Cabinet construction 85 ...
Page 89: ...Overview of kits Cabinet construction 89 ...
Page 90: ...Stage 1 Installation of common parts 90 Cabinet construction ...
Page 91: ...Stage 2 Side plate module mounting mechanics and quick connectors Cabinet construction 91 ...
Page 92: ...Stage 3 Flat PLS support kit for AC and common AC connection busbars 92 Cabinet construction ...
Page 93: ...Stage 4 Fan heat exchanger and cooling components Cabinet construction 93 ...
Page 94: ...Stage 5A Installation of DC busbars 94 Cabinet construction ...
Page 96: ...Stage 6 Module installation 96 Cabinet construction ...
Page 97: ...Stage 7 Installation of shrouding Cabinet construction 97 ...
Page 98: ...98 ...
Page 114: ...114 ...
Page 125: ...a b c Maintenance 125 ...
Page 180: ...180 ...
Page 206: ...206 ...
Page 208: ...Frame R8i module 208 Dimension drawings ...
Page 209: ... Quick connector Dimension drawings 209 ...
Page 210: ...LCL filter components Grid side choke BLCL 15LC 7 and BLCL 24LC 7 210 Dimension drawings ...
Page 211: ... Grid side choke BLCL 25LC 7 Dimension drawings 211 ...
Page 212: ... Converter side choke BLCL 15LC 7 and BLCL 24LC 7 212 Dimension drawings ...
Page 213: ... Converter side choke BLCL 25LC 7 Dimension drawings 213 ...
Page 214: ... Capacitor www tdk electronics tdk com 214 Dimension drawings ...
Page 276: ...276 ...