![ABB ACS580MV Hardware Manual Download Page 72](http://html1.mh-extra.com/html/abb/acs580mv/acs580mv_hardware-manual_3348342072.webp)
72 Electrical installation
•
Galvanized plate (1 in figure below) with EMC cushions (2, 3, 4) and sealing grommets
(5). See
ACS580MV Base frame & TEU layout design
for details and for the possible
mounting variants.
Material for cable entry with EMC plate (bottom mounted)
The EMC cushions (1 in figure below) are mounted on the underside of the EMC plate
when entering cables from top. They are mounted on top of the EMC plate when entering
cables from underneath.
EMC cushion. See
for more information.
1
Lead through plate
2
Bracket
3
Bracket
4
EMC cushions
5
Sealing grommets
6
Opening in cable entry plate
4
5
1
3
2
6
1
Summary of Contents for ACS580MV
Page 1: ...ABB industrial drives Hardware manual ACS580MV drives 200 kW to 6300 kW 6 kV to 11 kV...
Page 4: ......
Page 10: ...10...
Page 50: ...50 Control system and interfaces...
Page 52: ...52 Guidelines for planning the electrical installation...
Page 77: ...Electrical installation 77 Power cable entry from top 1 screen extensions to ground 1...
Page 90: ...90 Installation checklist...
Page 142: ...142 Maintenance...
Page 144: ......
Page 146: ...Contact us 2UBB004520 Rev E EN 2019 06 27 www abb com drives www abb com drivespartners...