![ABB ACS580MV Hardware Manual Download Page 17](http://html1.mh-extra.com/html/abb/acs580mv/acs580mv_hardware-manual_3348342017.webp)
Safety instructions 17
Electrical safety in installation, start-up and maintenance
Precautions before electrical work
These warnings are for all personnel who do work on the drive, motor cable or motor.
Obey these
instructions. If you ignore them, injury or death, or damage to the equipment
can occur. If you are not a qualified electrician, do not do installation or maintenance work.
Go through these steps before you begin any installation or maintenance work.
1. Clearly identify the work location.
2. Disconnect all possible voltage sources.
•
Open the main circuit breaker of the drive.
•
Wait until internal circuits are discharged completely and doors are unlocked (15
minutes).
•
Open the upstream disconnector to disconnect the supply voltage from the input
busbars.
•
Disconnect any external power sources from the control circuits before you do
work on the control cables.
3. Protect any other energized parts in the work location against contact.
4. Take special precautions when close to bare conductors (e.g. when the protective
plate between COU and TEU is removed).
DANGER
High voltage!
Before starting to work on the drive, make sure:
•
that the main and auxiliary power supply to the drive is switched off, locked out, and
tagged out
•
that the drive is dead
•
that safety ground connections are in place
•
that personal protective equipment is provided and used when required
•
that everyone involved is informed.
Before energizing the drive, make sure:
•
that all foreign objects are removed from the drive
•
that all internal and external covers are securely fastened and all doors are closed,
locked and / or bolted
•
that the release dials of safety switches are in the locked position.
Summary of Contents for ACS580MV
Page 1: ...ABB industrial drives Hardware manual ACS580MV drives 200 kW to 6300 kW 6 kV to 11 kV...
Page 4: ......
Page 10: ...10...
Page 50: ...50 Control system and interfaces...
Page 52: ...52 Guidelines for planning the electrical installation...
Page 77: ...Electrical installation 77 Power cable entry from top 1 screen extensions to ground 1...
Page 90: ...90 Installation checklist...
Page 142: ...142 Maintenance...
Page 144: ......
Page 146: ...Contact us 2UBB004520 Rev E EN 2019 06 27 www abb com drives www abb com drivespartners...