Maintenance 123
Mounting
1. Install the new module in reverse order of removal.
2. Switch on all miniature circuit breakers in the control compartment.
3. When the work is completed the drive can be started up again. See Chapter
Operation, Energizing and starting the drive
.
Converter module testing and repair
Testing and repair of a defective power module is done at ABB works. Send the module in
for repair.
Replacing the power module fuse
R4 - R6
1. Stop, de-energize and ground the drive following the steps in section
before you start the work.
2. Switch off all miniature circuit breakers in the control compartment.
3. Ground the power modules according to
Grounding power module with grounding
on page
.
4. Loosen the 2 mounting screws of the fuse to be replaced.
5. Pull out the fuse.
6. Install the replacement fuse in reverse order of removal.
7. Reinstall the power module in reverse order of removal.
8. Switch on all miniature circuit breakers in the control compartment.
9. When the work is completed the drive can be started up again. See Chapter
Operation, Energizing and starting the drive
.
Replacing power module fuse on a module of frame size R4 - R6
Summary of Contents for ACS580MV
Page 1: ...ABB industrial drives Hardware manual ACS580MV drives 200 kW to 6300 kW 6 kV to 11 kV...
Page 4: ......
Page 10: ...10...
Page 50: ...50 Control system and interfaces...
Page 52: ...52 Guidelines for planning the electrical installation...
Page 77: ...Electrical installation 77 Power cable entry from top 1 screen extensions to ground 1...
Page 90: ...90 Installation checklist...
Page 142: ...142 Maintenance...
Page 144: ......
Page 146: ...Contact us 2UBB004520 Rev E EN 2019 06 27 www abb com drives www abb com drivespartners...