![ABB ACS580MV Hardware Manual Download Page 104](http://html1.mh-extra.com/html/abb/acs580mv/acs580mv_hardware-manual_3348342104.webp)
104 Maintenance
After the DC link capacitors have discharged completely, the cabinet doors of the
power compartments unlock, the
SUPPLY OFF
pushbutton changes to a permanent
light and the status line displays
.
4. Rack-out, lock-out, ground and tag-out the main power feeder.
5. Switch off and lock-out all auxiliary voltages from external sources.
6. Verify that the drive system is de-energized.
7. To connect a grounding set, continue with
8. To open the door of the medium voltage compartment, continue with
on page
Tip
: To open the power compartment doors, auxiliary voltage is required.
9. Before start working in the power compartment, the power modules must be
individually grounded by touching them with the grounding stick. See
power module with grounding hook
.
Unlocking and locking the doors
The door is secured by a safety switch and the control compartment door has pivoted door
handles and locks with triangular inserts. Open the door with the supplied key.
1. To release the door handle, insert and turn the key to the right. The door handle will
pop out.
2. To open the door, turn the door handle
•
to the right, if the door is hinged on the right,
•
to the left, if the door is hinged on the left.
3. To lock the door, bring the door handle in line with the door plate and press the handle
down until it clicks in.
Connecting a grounding set
Before starting to work on the drive, you must ground the three input and three output
terminals in the terminal unit (TEU). Always ground the drive on both sides, i.e. on supply
and motor side. Grounding on motor side is needed to avoid induced voltage from a
spinning rotor.
Summary of Contents for ACS580MV
Page 1: ...ABB industrial drives Hardware manual ACS580MV drives 200 kW to 6300 kW 6 kV to 11 kV...
Page 4: ......
Page 10: ...10...
Page 50: ...50 Control system and interfaces...
Page 52: ...52 Guidelines for planning the electrical installation...
Page 77: ...Electrical installation 77 Power cable entry from top 1 screen extensions to ground 1...
Page 90: ...90 Installation checklist...
Page 142: ...142 Maintenance...
Page 144: ......
Page 146: ...Contact us 2UBB004520 Rev E EN 2019 06 27 www abb com drives www abb com drivespartners...