117
ACS2000 AFE 1MVA UM
3BHS297030 ZAB E01 REV. J
—
Motor
Insulation tests
Power supply
Miscellaneous
1.
Motor installed, aligned and alignment protocol available
2.
Motor not coupled to driven load
3.
Ground connection completed
4.
Motor auxiliaries (eg, bearing lubrication, heater cooling) ready
1.
All power cables to input transformer, between input transformer and drive, and from drive to motor mea-
sured, measured values within the required limits.
2.
Report of the megger test available
If the test is carried out by the commissioning engineer of the drive, an additional day per drive motor
combination needs to be reserved. After the test, the feeder cables can be connected, except at the drive
end. The test must comply with the specification.
1.
Medium voltage available for start-up of drive
2.
Low voltage auxiliary power available for start-up of drive
1.
Sufficient number and correct type of spare parts available
2.
Air conditioning of drive room ready for load run of drive
3.
Optional equipment ready
Summary of Contents for ACS2000 AFE 1MVA
Page 6: ...170 Replacing filter mats 171 Phase modules location 171 Phase module Dimensions and weight ...
Page 8: ...Terms trademarks related documentation ...
Page 13: ...13 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Page 14: ...General information on manual and drive ...
Page 19: ...19 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Page 20: ...Important note on main circuit breaker ...
Page 48: ...Chapter 3 Control system 49 Overview 50 Main components 54 I O interfaces ...
Page 67: ...67 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Page 77: ...77 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Page 83: ...83 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J 5 1 3 2 1 4 A B C E D ...
Page 85: ...85 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Page 113: ...113 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Page 114: ...Commissioning check list ...
Page 149: ...149 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Page 176: ......