5.
Mount the IED with the rack mounting panels to the 19" rack.
6.
Tighten the fixing screws.
7.
Install the RTXP 8, 18 or 24 test switch.
8.
Attach the front cover over to the test switch.
1
3
4
2
5
GUID-A01C5E4D-D118-4B6E-863E-3213C762381A V1 EN
Figure 10:
IED mounted with test switch RTXP 18
1 Left mounting bracket
2 Screws
3 Test switch
4 Right mounting bracket
5 Plastic front cover
An IED equipped with optical connections requires a minimum
depth of 180 mm. Check the allowed minimum bending radius
from the optical cable manufacturer.
Section 4
1MRS755958 C
Mounting
24
630 series
Installation Manual
Summary of Contents for 630 series
Page 1: ...Relion Protection and Control 630 series Installation Manual ...
Page 2: ......
Page 8: ......
Page 11: ...Section 10 Glossary 83 Table of contents 630 series 3 Installation Manual ...
Page 12: ...4 ...
Page 18: ...10 ...
Page 44: ...36 ...
Page 70: ...62 ...
Page 72: ...64 ...
Page 90: ...82 ...
Page 92: ...84 ...
Page 93: ...85 ...
Page 94: ......
Page 95: ......