A
B
F
E
B
B
B
2
3
4
C D
G
H
I
J
K
L
1
GUID-29762F39-AE54-4020-9111-6706BCF6CA1A V1 EN
Figure 12:
Drill plan for the LHMI
A 220 mm
1 LHMI outline
B M3
2 Surface coating on rear side of panel must be removed ∅15 mm
C 177 mm
3 Hole for GND connection
D 162 mm
4 Hole for cable from IED to LHMI
E ∅6.5 mm
F ∅20 mm
G 78 mm
H 7.5 mm
I
38 mm
J 128 mm
K 33 mm
L 18.5 mm
2.
Thread the four holes for the M3 screws.
3.
Remove surface coating from the rear side of the panel for the GND screw.
4.
Draw the LHMI cable through the hole for cable from IED to LHMI.
5.
Connect the cable to the LHMI.
6.
Mount the external LHMI display using four M3 screws.
7.
Tighten the four M3 screws.
8.
Ground the LHMI.
1MRS755958 C
Section 4
Mounting
630 series
27
Installation Manual
Summary of Contents for 630 series
Page 1: ...Relion Protection and Control 630 series Installation Manual ...
Page 2: ......
Page 8: ......
Page 11: ...Section 10 Glossary 83 Table of contents 630 series 3 Installation Manual ...
Page 12: ...4 ...
Page 18: ...10 ...
Page 44: ...36 ...
Page 70: ...62 ...
Page 72: ...64 ...
Page 90: ...82 ...
Page 92: ...84 ...
Page 93: ...85 ...
Page 94: ......
Page 95: ......