I M P O R TA N T S A FE T Y I N S T R U C T I O N S
15
DANGER
RISK OF BACKFEED VOLTAGE, ISOLATE THE UPS INSTALLING AN EXTERNAL
ISOLATING DEVICE BETWEEN MAINS INPUT AND UPS; BEFORE OPERATING
ON THIS CIRCUIT, CHECK FOR HAZARDOUS VOLTAGE.
DANGER
TO REDUCE THE RISK OF FIRE, THE UNIT SHOULD ONLY CONNECT TO A
CIRCUIT PROVIDED WITH BRANCH CIRCUIT OVERCURRENT PROTECTION FOR:
•
D CURVE 10A RATING (UPSTREAM CIRCUIT), FOR 1kVA (B/S) MODELS,
•
D CURVE 16A RATING (UPSTREAM CIRCUIT), FOR 2kVA (B/S) MODELS,
•
D CURVE 20A RATING (UPSTREAM CIRCUIT), FOR 3kVA (B/S) MODELS.
DANGER
HIGH LEAKAGE CURRENT:
MAKE SURE THAT THE EARTH WIRE IS CONNECTED.
COMMON INPUT/OUTPUT SOURCES CONNECTION
WARNING
BEFORE CARRING OUT ANY CONNECTION, CHECK THAT THE UPSTREAM
PROTECTION DEVICES (NORMAL AC SOURCE AND BYPASS AC SOURCES) ARE
OPEN “0” (OFF).
WARNING
WATER CONDENSING MAY OCCUR IF THE UPS IS UNPACKED IN A VERY LOW
TEMPERATURE. IN THIS CASE IT IS NECESSARY TO WAIT UNTIL THE UPS IS
FULLY DRIED INSIDE OUT BEFORE PROCEEDING INSTALLATION AND USE TO
AVOID HAZARDS AND ELECTRIC SHOCK, WAIT UNTIL THE UPS IS FULLY DRY
BOTH INSIDE AND OUTSIDE BEFORE INSTALLING.
WARNING
INDUCTIVE LOADS (FOR EXAMPLE MONITORS AND LASER PRINTERS) HAVE A
VERY HIGH POWER CONSUMPTION AT START-UP. IF CONNECTED TO THE
UPS, THE START-UP POWER OF SUCH LOADS MUST BE TAKEN INTO
CONSIDERATION WHEN CALCULATING THE CAPACITY OF THE UPS TO
PREVENT THE UPS FROM BEING OVERLOADED AND TURNED OFF.
NOTE
TO REDUCE THE RISK OF FIRE, CONNECT THE UPS TO A CIRCUIT PROVIDED
WITH BRANCH CIRCUIT OVERCURRENT PROTECTION WITH AN AMPERE
RATING IN ACCORDANCE WITH THE IEC/EN 60934 STANDARD OR YOUR
LOCAL ELECTRICAL CODE.
SEE TECHNICAL SPECIFICATIONS FOR RECOMMENDATIONS.
E
N
G
L
ISH
Summary of Contents for 4NWP106819R0001
Page 3: ...DOCUMENT INFORMATION 3 2 1 01 02 ...
Page 4: ...4 POWERVALUE 11 RT G2 1 3 KVA QUICK GUIDE 04 1 2 03 ...
Page 5: ...DOCUMENT INFORMATION 5 05 06 07 ...
Page 8: ...8 POWERVALUE 11 RT G2 1 3 KVA QUICK GUIDE ...
Page 10: ...10 POWERVALUE 11 RT G2 1 3 KVA QUICK GUIDE ...
Page 24: ...24 POWERVALUE 11 RT G2 1 3 KVA QUICK GUIDE E N G L I S H ...
Page 38: ...38 POWERVALUE 11 RT G2 1 3 KVA KURZANLEITUNG D E U T S C H ...
Page 52: ...52 POWERVALUE 11 RT G2 1 3 KVA GUIDE DE RÉFÉRENCE R APIDE FR ANÇAIS ...
Page 66: ...66 POWERVALUE 11 RT G2 1 3 KVA GUIDA R APIDA I TA L I A N O ...
Page 67: ...RISOLUZIONE DEI PROBLEMI 67 I TA L I A N O ...
Page 68: ...68 POWERVALUE 11 RT G2 1 3 KVA GUIDA R APIDA I TA L I A N O ...
Page 82: ...82 POWERVALUE 11 RT G2 1 3 KVA GUÍA R ÁPIDA E S PA Ñ O L ...
Page 96: ...96 POWERVALUE 11 RT G2 6 10 KVA GUIA DE CONSULTA R ÁPIDA P O R T U G U Ê S ...
Page 110: ...110 POWERVALUE 11 RT G2 1 3 KVA PIK AOPAS S U O M I ...
Page 124: ...124 POWERVALUE 11 RT G2 1 3 KVA KORT HANDLEDNING S V E N S K A ...
Page 138: ...138 POWERVALUE 11 RT G2 1 3 KVA K VIKGUIDE D A N S K ...
Page 152: ...152 POWERVALUE 11 RT G2 1 3 KVA RYCHLÝ PRŮVODCE Č E Š T I N A ...
Page 166: ...166 POWERVALUE 11 RT G2 1 3 КВ А КРАТКОЕ РУКОВОДСТВО Р УСС К И Й ...
Page 180: ...180 POWERVALUE 11 RT G2 1 3 KVA SKRÓCONY PODRĘCZNIK P O L S K I ...
Page 181: ... 速成指南 PowerValue 11 RT G2 1 3 kVA 重要安全须知 194 安装 199 操作 201 排故 203 中 文 ...
Page 194: ...194 POWERVALUE 11 RT G2 1 3 KVA 速成指南 中 文 ...
Page 208: ...208 POWERVALUE 11 RT G2 1 3 KVA Σ ΎΝΤΟΜΟΣ ΟΔΗΓΌΣ Ε Λ Λ Η Ν Ι Κ Ά ...
Page 222: ...222 POWERVALUE 11 RT G2 1 3 KVA BEKNOPTE INSTALLATIEHANDLEIDING D U T C H ...
Page 223: ......