364Ax-Gx Instruction Manual
18
Wall mounting
Vertical bracket
Wall mounting instruction
1. Fix the bracket
c
at the wall in the
final position
2. Connect the instrument interface
using the two long screws
d
and
bolts
e
in the package (the torque
value shall be between 10 Nm and
12 Nm)
3. Fix the Pressure transmitter
f
using
the two short screws
g
in the
package (the torque value shall be 1
Nm ± 0.2 Nm)
The use of the washers as indicated in the
picture is strongly reccomended
Digital LCD Integral Display positioning
In case the optional i ntegral display meter is
installed, it is possibl e to mount the display in fo ur
different positions rotated clockwise or counter-
clockwise with 90°
steps.
This is possible by using one of the four connections
located on the ba ck of t he display at a 90 ° angle
each from the other.
Wiring
HART hand-held communicator can be connected at any wiring termination point in the loop, the minimum
restistance provided must be 250 ohm. If this is less than 250 ohm, additional resistance should be added to
allow communication.
c
d
e
f
g
d
e
g