4.1.16 Always check for damaged parts and check their activity and synchronization. If any
parts are not working properly, please do not use the equipment.
4.1.17
Warning!
The work area should be non-flammable because there is an electric spark
when the switch is working.
4.2 Layout of the equipment
Before you install your lift, you should check the following items:
4.2.1 The work area should be designed and have enough space.
4.2.2 Avoid obstacles, such as the presence of wires in the installation area.
4.2.3 Carefully inspect the concrete floor where the equipment is to be installed for cracks and
check that the strength of the concrete meets the requirements. On the ground with a
compressive strength of not less than 25Mpa, the thickness of the ground concrete is not less
than 500mm, the number is not lower than C25, the newly poured concrete must be solidified
for at least 28 days, the ground error is not more than 3mm, and the expansion bolt size is
M19*160. Otherwise, the equipment will destroy the ground, which will cause damage to the
equipment and casualties.
4.2.4 The installation of the ground must ensure a certain level. The limit cannot exceed 5 mm.
Within this limit, it can be adjusted by a spacer. If the ground is severely uneven, it should be
repaired.
4.2.5 Installation of equipment on sloping floors or other non-concrete floors is prohibited.
4.2.6 It is forbidden to install equipment on cracked ground or inferior concrete floors.
4.2.7 Installation of equipment on the second floor or above is prohibited without the approval
of the architect.
4.2.8 If there is no protective measure, please do not install the equipment outdoors to avoid
damage to the motor in rainy weather.
4.2.9 Determine where the equipment is installed, then place the column and the platfrom in
their respective positions. Place the platfrom between the two columns
4.2.10 Confirm the position of the electrical control box and leave enough room for operation.
4.2.11 After confirming, draw the position of the bottom plate of the column with chalk to
ensure the error within 3mm, so as to avoid affecting the installation of the equipment.
。
4.2.12 Check carefully to make sure the layout is correct
。
Summary of Contents for AutoLift PP609
Page 8: ...8 FIG2 Up position schematic...
Page 18: ...18 FIG22 Chain Installation FIG23 Chain wrapping diagram Chain Clip Chain...
Page 24: ...24 6 Electrical schematic FIG 30 7 Hydraulic schematic FIG31...
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......