4.4.8 Control arm installation, Please fix the control arm according to the foundation drawing.
FIG28 Control Arm Installation diagram
4.4.9 Tubing connection
,
connect the 1 & 2 with T joint, connect the other side of the tube to
power unit.
Tubing 1
:
L= 1300mm, L=4200mm, Tubing 2: L=3500mm
FIG 29 Tubing Connection Diagram
Rear Leg
Tubing Groove
Three-way wire
M8*80 Expansion bolt
Control Arm
Tubing 1
Tubing 2