4.4.4Column fixing and stage 1 carriage support tube installation
FIG 6 stage 1 carriage support tube installation
4.4.5Platfrom install ,the installation sequence is 1 layer first and then 2 layers.
Platfrom Install :First install the left and right side beams, followed by the rear beam and the tie
rods, then install the wave plates in sequence, and finally install the ramp. After installation,
adjust the diagonals on both sides to ensure that the diagonal distance between the two
diagonals is less than 20mm. The installation order of the 1st and 2nd floor plates is the same.
stage 1 carriage support
tube
Here, Use 16 pieces of
M12*35 hex bolts, M12
nut, Ø12 flat washer,
Ø12 spring washer.
Note: The bolts are worn
from the outside to the
inside.
Summary of Contents for AutoLift PP609
Page 8: ...8 FIG2 Up position schematic...
Page 18: ...18 FIG22 Chain Installation FIG23 Chain wrapping diagram Chain Clip Chain...
Page 24: ...24 6 Electrical schematic FIG 30 7 Hydraulic schematic FIG31...
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......