Water/Glycol System
1.
Has the entire system been flushed and pressure checked?
Yes No
2.
Have isolation valves to the chiller been installed?
Yes No
3.
Have isolation valves to the boiler been installed?
Yes No
4.
Has the entire system been filled with fluid?
Yes No
5.
Has air been bled from the heat exchangers and piping?
Yes No
6.
Is there a minimum load of 50% of the design load?
Yes No
7.
Has the water piping been insulated?
Yes No
8.
Is the glycol the proper type and concentration (N/A if water)?
Yes No
9.
What is the freeze point of the glycol (N/A if water)?
______________________________
Chiller Configuration
Air-Cooled Chiller
Evaporative-Condensed Chiller
Low Ambient Control
Condenser Safety Check
No Water Leaks
Water Flow ________ gpm
Chilled Water In Temperature ________°F
Chilled Water Out Temperature ________°F
Boiler Configuration
No Water Leaks
Boiler Water Flow ________ gpm
Boiler Safety Check
Boiler Building Water Flow ________ gpm
Summary of Contents for LZ Series
Page 2: ......
Page 27: ...27 Figure 6 Concrete Pad Mounting with Dimensions Figure 7 LZ Base ...
Page 36: ...36 Figure 17 Typical Flue Vent Piping ...
Page 83: ...83 ...
Page 84: ...84 ...
Page 95: ...95 Flo Trex Cross Section ...