21
PulsePak Prime
GDED-IOM-216-B
To power up the DCT controller, connect power line to L1 and L2. Control
Wiring must be field installed between the solenoid valves and the pulse output
terminals as shown on the electrical connection diagram that is supplied with the
specific PulsePak Prime collector ordered. If the collector has been factory wired as
an option, the solenoids are prewired to a junction box with a terminal strip.