AAF provides plastic tubing for the pulse controller to be located 15ft from the
static taps. A more remote position is acceptable if additional tubing is obtained. A
practical limit of 30ft applies.
Once the pulse controller is fixed in position, connect two parallel lines of
plastic tubing to the 2 connection taps on the pulse controller and the other ends to
the static taps located on the side wall of the PulsePak Prime. These plastic pipes
allow the pulse controller to measure and display the differential pressure that exists
between the clean air plenum and dirty side plenum. In some modes of operation,
this differential pressure is used to control the pulsing.
Connect the high pressure port to the dirty side of the collector and connect
the low pressure port to the clean air side (back of the unit). Both ports are located
on the side of the collector.
See the separate pulse controller manual for a full explanation of its features
and modes of operation.
9.2.7
Installation of the filter elements
The Panel Pak filter elements are shipped separately in cartons for field
installation AFTER all ductwork connections are made. Proceed as follows:
1.
Open the access door to the module and remove the two (2) retaining
knobs from the leading edge of each filter mandrel.
2.
Carefully remove the mandrel support braces. Retain these braces, and
reinstall them as noted in step 6.
3.
Carefully remove the Panel Pak filter element from the carton. Inspect
to make sure gasket is intact.
4.
Grasp the filter along the metal sides and slide the element onto the
support until its gasket is seated. Avoid contact with pleated media.
5.
Continue this procedure for all the Panel Pak cartridges. It is
recommended that elements be installed in sequence from top to
bottom.