background image

®

Aluminum Athletic Equipment

1000 Enterprise Drive, Royersford, PA 19468

 Toll Free: (800) 523-5471  Phone: (610) 825-6565

www.aaesports.com

   5'-0"

60"

  

   10'-0"

120"

  

   31'-0"

372"

  

Lower Horizontal 

Cable Collar

w/ Anchor 

Shackle for 

Crimped End 

Loop

Lower Vertical

Cable Collar

w/ Tensioner

Assembly

(see collar orientation

detail)

 

Upper Vertical

Cable Collar

Assembly 

(see collar orientation

detail)

Front

View

Debris Ring

(Optional)

If not present

Make sure

lower collars

are positioned

accordingly.

Left

View

Post Cap

pre-installed

Net Pulley 

System

  40.00°  

Collar Orientation

Detail

(Note: 

ONLY

 vertical cable 

collars should be turned 

away from netting, this aids 

in tensioning the net)

Eyebolt

Detail

3

4

5

Cleat

Detail

10

8

8

6

7

9

9

1

Open

Eyebolt Collar

Detail

Installation Notes:

Lower Collars:

 From bottom

1.

of pole slide the lower vertical

cable collar, lower horizontal

collar and and debris ring

(

optional

) into position. To

allow proper insertion into

ground sleeve, lower most

collar should be 60" from end

of post. 

Before securing 

collars into place make sure 

to rotate the lower vertical 

collar approx 40°.

 (

refer to 

diagram

)

Cleat:

 Is to be installed so

2.

that it is on backside of post,

opposite net. Screws will be

inserted through cleat and

post and secured on net side

using  flat washers, self

locking hex-nuts and cap

nuts. (

refer to diagram

)

Mid Collar:

 Note orientation

3.

of collar on post. From top of

pole slide the open eyebolt

collar into position, refer to

dimension provided and

secure into place.

Eyebolt:

 Pulley system

4.

comes preassembled to

eyebolt. Install washer onto

eyebolt then insert eyebolt

with washer through front

side of hole at top of post.

From  opposite side secure

eyebolt into place using a

flatwasher and Nylock hex-

nut. (

refer to diagram

)

Upper Collar:

 From top of

5.

pole slide the upper vertical

cable collar into position

(collar should rest on eyebolt

washers). Before securing

into place make sure to rotate

the collar approx 40°. (

refer 

to diagram

)

Make sure warning labels are

6.

present on goal posts.

Note:

Post assembly 

should be done 

with post laying 

down on flat 

level surface.

SBS-40

Assembly Instruction

Right End Post

9

 of 1

2

Summary of Contents for SBS-40

Page 1: ... Aluminum Athletic Equipment 1000 Enterprise Drive Royersford PA 19468 Toll Free 800 523 5471 Phone 610 825 6565 www aaesports com 1 of 12 SBS 40 40 High Soccer BallStopper System Specification ...

Page 2: ...0 523 5471 Phone 610 825 6565 www aaesports com 20 0 240 MAX 20 0 240 MAX 20 0 240 MAX Refer to Association Guidlines for Placement Distance Post Spacing Distance is not to Exceed Specification Field of Play End Line Left End Post Inner Post Inner Post Right End Post SBS 40 Specifications 6 3 2016 SBS 40 40 HIGH BALLSTOPPER SYSTEM CUSTOMER Concrete Footing Placement Specification DWG NO SBS 40 C 0...

Page 3: ...re Stainless Steel Pear Clip Stainless Steel DETAIL D Tensioner Kit Galvanized Steel DETAIL B Open Eyebolt Stainless Steel End Posts Only SBS 40 Specifications Post Aluminum 8 x 188 wall aluminum tube Mill Aluminum 6061T6 46 0 Overall Length 41 0 out of ground sleeve Weight 249lbs ea All Hardware is RUSTPROOF Netting Net AAE N367 3 1 2 Sq Knotted Nylon FR DBB length to vary 1 4 MFP Rope Border UV ...

Page 4: ... 36 Hole Diameter 6 6 78 Sleeve Length 4 6 5 0 60 to Stop Bolt Stabilzed Subgrade Crushed Stone C o n c r e t e C o n c r e t e Aggregate Aggregate Artificial Grass Field Footing Specification Turf Turf Top of post sleeve should be even with aggregate 2 A B C D DRAWN BY CAD FILE MODEL DATE NOTE SBS 40 Specifications 6 3 2016 SBS 40 N R Grass Turf Footing Specification DESCRIPTION 1 2 3 4 5 6 A B C...

Page 5: ...side Left Right End Post Lower Vertical Cable Tensioner Collar Assembly Cable loop end show for reference only not pre installed Cable loop end show for reference only not pre installed A A A A Note Hardware denoted with A is included in item 12 tensioner kit 11 16 15 14 A Inner Post Lower Horizontal Cable Pear Clip Collar Assembly 14 13 15 16 11 18 19 17 20 21 Left Right End Post Mid Vertical Cab...

Page 6: ... Aluminum Athletic Equipment 1000 Enterprise Drive Royersford PA 19468 Toll Free 800 523 5471 Phone 610 825 6565 www aaesports com Model No SBS 40 Parts List 6 of 12 ...

Page 7: ...end of post Before securing collars into place make sure to rotate the lower vertical collar approx 40 refer to diagram Cleat Is to be installed so that 2 it is on backside of post opposite net Screws will be inserted through cleat and post and secured on net side using flat washers Nylock hex nuts and cap nuts refer to diagram Mid Collar Note orientation of 3 collar on post From top of pole slide...

Page 8: ...rrect orientation refer to diagram Cleat Is to be installed so that 2 it is on backside of post opposite net Screws will be inserted through cleat and post and secured on net side using flat washers self locking hex nuts and cap nuts refer to diagram Eyebolt Pulley system comes 3 preassembled to eyebolt Install washer onto eyebolt then insert eyebolt with washer through front side of hole at top o...

Page 9: ...ould be 60 from end of post Before securing collars into place make sure to rotate the lower vertical collar approx 40 refer to diagram Cleat Is to be installed so 2 that it is on backside of post opposite net Screws will be inserted through cleat and post and secured on net side using flat washers self locking hex nuts and cap nuts refer to diagram Mid Collar Note orientation 3 of collar on post ...

Page 10: ...nto place secure the lower collar s into place Post Groundsleeve Installation Installation Notes View above is from net side of post field 1 of play Caution slowly lower posts into sleeves 2 Dropping post into sleeve may result in damage to the stop bolt Make sure all posts are orientated 3 correctly Pulley system towards field of play and cleet away from field of play All lower horizontal cable c...

Page 11: ...detail on collar and cable assembly Install Crimped Cable End to Right End 2 Post collar using an anchor shackle Route cable to Left End Post Snap cable 3 into Pear Clips of the Inner Posts along the way Before assembling Clamped Cable Loop 4 End fully open the turnbuckle With anchor shackle and thimble inplace 5 run cable thru the shackle as shown Pull slack out of cable and mark vinyl sleeve app...

Page 12: ... of posts Using a Pear Clip Secure upper net 2 corners to End Post Vertical Support Cables as shown in Detail C Secure Brass Rings to top of net using 3 Cable Clamp as shown in Detail A One ring and clamp per post and they should be centered as close as possible to its coinciding post After Brass Rings have been secured to 4 net clip ring into it s posts hoist system Pear Clip as shown in Detail B...

Reviews: