®
Aluminum Athletic Equipment
1000 Enterprise Drive, Royersford, PA 19468
Toll Free: (800) 523-5471 Phone: (610) 825-6565
www.aaesports.com
5'-0"
60"
(REF)
41'-0"
492"
Debris Ring
(Optional)
If not present
Make sure
lower collars
are positioned
accordingly.
Net Pulley
System
Right
View
Post Cap
pre-installed
Lower Horizontal
Cable Collar
w/ Pear Clip
Front
View
Cleat
Detail
6
7
8
10
8
9
9
1
Eyebolt Detail
5
4
3
Collar Orientation
Detail
Installation Notes:
Lower Collars:
From bottom
1.
of pole slide the lower
horizontal collar and and
debris ring (
optional
) into
position. To allow proper
insertion into ground sleeve,
lower most collar should be
60" from end of post.
Before
securing collars into place
verify correct orientation.
(
refer
to diagram
)
Cleat:
Is to be installed so that
2.
it is on backside of post,
opposite net. Screws will be
inserted through cleat and post
and secured on net side using
flat washers, self locking hex-
nuts and cap nuts. (
refer to
diagram
)
Eyebolt:
Pulley system comes
3.
preassembled to eyebolt.
Install washer onto eyebolt
then insert eyebolt with washer
through front side of hole at
top of post. From opposite
side secure eyebolt into place
using a flatwasher and self-
locking hex-nut. (
refer to
diagram
)
Upper Collar:
From top of
4.
pole slide the upper vertical
cable collar into position (collar
should rest on eyebolt
washers).
Before securing
collars into place verify correct
orientation
. (
refer to diagram
)
Make sure warning labels are
5.
present on goal posts.
Note:
Post assembly should
be done with post
laying down on flat
level surface.
SBS-40
Assembly Instruction
Inner Post
8
of 1
2